Broughton & Yeamans House

Broughton & Yeamans House are high rise apartment blocks in Bristol, Avon, under the management of Bristol City Council. The roof areas, totalling over 3,500m2, had originally been waterproofed with asphalt and then later treated with a coating repair.


Unfortunately, water ingress continued to be a problem with leaking occurring at numerous locations. Not wanting to cause further disruption to the residents and to avoid costly damage to the interior of the buildings, the council contacted Polyroof and a survey of the roof was arranged.

The survey by Polyroof’s Technical Services highlighted the extent of the issues within the roof, including identifying water ingress through the many vertical sections present on the roofs, including parapet walls and the lift house building. After performing core tests on the roof, it was shown that the existing roof build, which contained insulation as part of a warm roof design, was in a suitable condition to be retained and overlaid – avoiding costly disruption for the client and residents.


A bespoke specification was drawn up by the Polyroof Technical Team that provided a comprehensive set of recommendations to ensure the apartment blocks were fully protected from the elements.

To make sure the roof could be left in a totally weatherproof condition, it was necessary to treat not only the flat roof sections but the vertical areas too. The client was keen to improve the thermal performance of the buildings by adding additional insulation, but it was imperative that disruption was kept to a minimum – not only would stripping works impact on the buildings’ residents, but hauling waste materials from such a great height would be costly and logistically challenging.


With BBA approval, top-rated fire performance and Polyroof’s trusted 20 Year Accredited System Guarantee, the client has total peace of mind that the apartment block could not be better protected for decades to come.

More Case Studies

Wimbledon Tennis Courts

The Phase 3 gutter refurbishment at Wimbledon’s Centre Court and No. 1 Court showcases how

Flat Holm Island

The refurbishment of Flat Holm Island’s Foghorn Station demonstrates the unmatched advantages of specifying the

Oatley House

The Oatley House roof refurbishment highlights the advantages of specifying the Polyroof Protec Evolve System

Pattern House

Polyroof’s fully cold-applied liquid Protec System was specified for the refurbishment of the multi-roof Pattern

26 Belmont Terrace

The refurbishment at 26 Belmont Terrace showcases the standout benefits of specifying the Polyroof Protec

Low odour roofing project

Golftyn Primary School

Polyroof’s ultra-low odour, sustainable liquid applied membrane, Protec Evolve, was specified by Designed Roof Systems

CASE STUDY

0
Would love your thoughts, please comment.x
()
x