Guernsey Power Station

The flat roof area at above the vast Guernsey Power Station had been suffering from water ingress as a result of failings in the existing EPDM membrane. Due to the expensive machinery housed within and the potential for widespread and costly disruption should the leaking continue.


Guernsey Electricity turned to Sarnian Roofing Limited, a Polyroof approved contractor, to provide a rapid and effective waterproofing solution. The Protec System was specified, and work began quickly.

The Solution

Removal of the failed roof coverings to expose the concrete deck below began, and the BBA-approved Protec 20-year system was installed directly to the concrete. Due to its RapidCure technology, the system cures within 30-60 minutes, meaning less disruption for the client.


The Protec System provides an flexible and seamless membrane that eliminates the risk of water ingress around penetration points common in industrial unit roofs. As the system is cold applied, there are none of the safety risks associated with the open flames and hot torches used with traditional roll-applied systems.

Polyroof’s reputation has been built on the high level of technical support provided to clients before, during and after every contract.


We like to work closely with our clients from the very beginning of a flat roofing project right through to completion and throughout the lifespan of the roof. From our experience, this is the best way to guarantee that all aspects of the roof are finished to the superior standards that our clients expect.

More Case Studies

Wimbledon Tennis Courts

The Phase 3 gutter refurbishment at Wimbledon’s Centre Court and No. 1 Court showcases how

Flat Holm Island

The refurbishment of Flat Holm Island’s Foghorn Station demonstrates the unmatched advantages of specifying the

Oatley House

The Oatley House roof refurbishment highlights the advantages of specifying the Polyroof Protec Evolve System

Pattern House

Polyroof’s fully cold-applied liquid Protec System was specified for the refurbishment of the multi-roof Pattern

26 Belmont Terrace

The refurbishment at 26 Belmont Terrace showcases the standout benefits of specifying the Polyroof Protec

Low odour roofing project

Golftyn Primary School

Polyroof’s ultra-low odour, sustainable liquid applied membrane, Protec Evolve, was specified by Designed Roof Systems

CASE STUDY

0
Would love your thoughts, please comment.x
()
x