Golftyn Primary School

Project Size:
100
Approved Contractor:
Designed Roof Systems Ltd
Location:
Connah’s Quay
Project Type:
Refurbishment
Sector:
Education
System Installed:
Protec Evolve
Low odour roofing project

Golftyn Primary School

Polyroof’s ultra-low odour, sustainable liquid applied membrane, Protec Evolve, was specified by Designed Roof Systems Ltd for the refurbishment of Golftyn Primary School. Boasting exceptional performance benefits, including RapidCure technology for extremely fast application, Protec Evolve is bolstered with a BBA durability rating of at least 30 years. The System is ideal for installation within sensitive environments,  including schools, keeping disruption to a minimum.

Explore the potential of Polyroof’s flagship Protec Evolve System >>

The Challenge

Due to ongoing issues with the roof of a temporary classroom at Golftyn Primary School, Flintshire County Council looked towards Polyroof to alleviate the water ingress and ensure adequate waterproof performance for the roof area. Comprised of a single-ply membrane, which was in a poor and aged condition, numerous issues had been reported within the interior of the building, causing disruption to the school’s teaching programme.

The Solution

Due to the live operational environment, the remedial measures needed to accommodate the school’s schedule and cause as little disruption as possible. Polyroof’s Technical Team recommended the ultra-low odour Protec Evolve System to refurbish the 100m2 classroom roof. Encompassing RapidCure technology, with cure times as little as 30 minutes, this allows the waterproofing membrane to be installed in a matter of hours rather than days. Polyroof-approved contractor, Designed Roof Systems Ltd, removed the failed roof covering before installing a new plywood deck, which was primed with Polyroof SA Primer, before the application of the Polyroof SA Foil-Faced Carrier Layer. This ensured the substrate was fully prepared for the new waterproofing membrane, which is fully cold applied thus negating health and safety concerns around hot works.

The Result

Following the application of the Protec Evolve System, the classroom at Golftyn Primary School is now fully waterproofed, providing high performing, seamless protection to the roof area. With full BBA-certification for a lifespan of at least 30 years, the school’s operations can safely continue without the concern of leaks arising. Phil Reid, Business Development Manager for Polyroof, said: “As a proud Welsh manufacturer for over 40 years, it has been a pleasure to collaborate with Flintshire County Council on this project. We strive to work closely with our network of clients across Wales, providing full project lifecycle support to ensure the best possible outcome. The finished result at Golftyn Primary Schools highlights our industry-leading liquid waterproofing technology combined with best-in-class technical support.”

If you are working on an education project and require specification assistance, contact our team of experts for advice.

More Case Studies

Wimbledon Tennis Courts

The Phase 3 gutter refurbishment at Wimbledon’s Centre Court and No. 1 Court showcases how

Flat Holm Island

The refurbishment of Flat Holm Island’s Foghorn Station demonstrates the unmatched advantages of specifying the

Oatley House

The Oatley House roof refurbishment highlights the advantages of specifying the Polyroof Protec Evolve System

Pattern House

Polyroof’s fully cold-applied liquid Protec System was specified for the refurbishment of the multi-roof Pattern

26 Belmont Terrace

The refurbishment at 26 Belmont Terrace showcases the standout benefits of specifying the Polyroof Protec

Low odour roofing project

Golftyn Primary School

Polyroof’s ultra-low odour, sustainable liquid applied membrane, Protec Evolve, was specified by Designed Roof Systems

CASE STUDY

0
Would love your thoughts, please comment.x
()
x