St Stephen’s Primary School

Project Size: 300m2

Approved Contractor: KSD Group

Location: Blackburn

Project Type: Refurbishment

Sector: Education

System Installed: Xtraflex System

St Stephen’s Primary School

A friendly and welcoming school based in Blackburn in the North West of England, St Stephens Church of England Primary School is a place where pupils can develop their skills in a school that is proud of its Christian values and high standards of teaching. The school has been praised for its philosophy of continuous improvement by a recent ofsted inspection, providing a nurturing environment for children.
Continuing the high level of teaching facilities was paramount for the school, and after discovering that the gutters and parapets of the building were aged and leaking, it was vital that a solution was found before this caused issues.

The Challenge

In coordination with Polyroof Products Ltd a survey was scheduled to take place at the site to determine the exact nature of the issues and formulate a solution. Upon inspection it was discovered that the existing waterproofing consisted of a single-ply membrane which had become aged with various leaks being reported and localised repairs carried out with not much effect. The underlying build-up consisted of a galvanised steel metal deck and had been coated in plasticol. Once the survey was complete it was clear that the gutters and capping’s would benefit from a high-performance waterproofing system installation, this would protect from further leaks occurring.

The Solution

The System of choice for this project was Protec Xtraflex. Protec Xtraflex is a highly flexible version of the Protec system designed for coating gutters. Its fast curing technology and imperviousness to standing water fulfilled the rapid solution needed to offer durable waterproofing performance for this project. Taking into consideration the information obtained from the survey, a bespoke Polyroof specification was created to combat all of the issues discovered. The chosen Polyroof Approved Contractor to carry out the work on this project was the KSD Group, a contractor with a wealth of experience in the roofing and construction sector.

Once all these aspects were in place, work could officially begin. Firstly, it was highlighted that falls and drainage were already present, so the Polyroof specification made use of the existing falls, combining this with the chosen waterproofing system. During this project, there was no need to strip back any of the existing waterproofing. It was made good where required, allowing a smooth substrate for the new system to be bonded to. Once this stage was complete, the area was cleaned and prepared for the new system by removing any dirt and debris. The Protec Xtraflex system was now ready for installation. Firstly, all surfaces that required it were primed, including the single ply existing waterproofing, which required a Polyroof SP Primer 202. During this installation, all lap joints and bolt heads were applied with Polyroof Butyl Tape and Polyroof Butyl Lap Tape, reinforcing these points before application. Pre-formed high-quality Polyroof drip trims were installed to the outer edge of the metal capping, and new flashings were also installed to cover the exposed insulation at this detail.


The first coat of Polyroof Protec Xtraflex was applied to the substrate. This consisted of Xtraflex resin and Polymat 450 and was allowed to cure. Due to the rapid cure technology of the system, this only took 30 – 60 minutes, allowing for quick installation. Once complete, the second coat of Protec Xtraflex Resin was installed and allowed to cure.

Completion

The project was efficiently managed by both the contractor KSD Group and regular Polyroof Technical Services visits to ensure that each aspect of the project from start to finish was carried out within the client’s specification, time frame and budget. The project was a great success showing the high-quality work from KSD Group. The customer can now be confident that this new Polyroof Protec Xtraflex membrane will last for many decades to come.

More Case Studies

Britannia Wharf

Britannia Wharf overlooks the remarkable wildlife corridor of the reclaimed historic Basingstoke Canal, which offers

Latymer School

Founded in 1624, the Latymer School has provided an excellent education to the young people

Warwick House

During April 2023, Polyroof, working alongside Howard Roofing and SPV, completed the refurbishment of the

Rhondda Heritage Park

The Rhondda Heritage Park is a renowned tourist destination in South Wales, offering a glimpse

Harraby Community Campus

Polyroof and LRL Roofing Solutions were approached to refurbish the flat roof area at Harraby

Kal Kitchen Accessories

KAL is a member of the Gowan Group, a family-owned holding company, directly controlling many

CASE STUDY

We use cookies.

We use cookies and similar technologies to improve your experience and measure your interactions with our websites, products and services. By clicking “Accept” or closing this banner, you agree to our website cookie use as described in our Cookie policy. If you click Reject Cookies button you will be redirected to our cookie policy.