The offices of The Dungannon & South Tyrone Borough Council had fallen into a poor condition and a large amount of standing water was threatening to leak into the offices below. With the office roof areas in such a poor state, the council turned to Polyroof, to refurbish nearly 1000 square metres of roof, split into 13 areas, before they fell into a further state of disrepair.
The standing water was cleared by an Approved Polyroof Contractor, before stripping back the existing roof materials. This allowed a new warm-roof system to be installed, along with new cut to falls insulation, our Protec Cut to Falls insulation is an innovative two layer system which doesn’t only improve thermal performance, it also directs standing water away from the roof. Following this, the BBA-approved Protec system was used to seamlessly waterproof the entirety of the office roofs. The system came with a 20 year guarantee so the client could relax, knowing they would no longer have to worry about their roof.

Dungannon Council Offices

Project Size: 861m2
Approved Contractor: DTL Construction
Location: Bristol
Project Type: Civic & Public
Sector: Residential
System Installed: Protec System

More Polyroof Case Studies

Accreditations & Associations

We use cookies.

We use cookies and similar technologies to improve your experience and measure your interactions with our websites, products and services. By clicking “Accept” or closing this banner, you agree to our website cookie use as described in our Cookie policy. If you click Reject Cookies button you will be redirected to our cookie policy.